Electric Distribution & Substations:<br>Power Quality & Distribution

Electric Distribution & Substations:
Power Quality & Distribution

Burns & McDonnell performs engineering services for many clients on a wide variety of transmission- and distribution-related projects. Our analysis and design experience ranges from small 4.16-kV projects to multimillion-dollar 500-kV projects.

Our experience also includes design of customer-owned substations for both private- and public-sector clients, including transmission interconnection configurations for combined heat and power and full analysis and design of relay equipment.

Improving Power Reliability and Consistency

In some cases, installing a customer-owned substation can pay for itself in less than five years. Customer-owned substations provide improved reliability and avoid the outages more common with utility distribution systems. In addition, detailed analysis and review of a campus electric distribution system will show opportunities to harden your system and provide the dependable and consistent electricity required for today's complex and demanding facilities.

As a recognized leader in the transmission and distribution industry, Burns & McDonnell has the right knowledge and experience to make our clients successful.

  • Arc flash studies
  • Black start generation design
  • Commissioning and startup
  • Emergency power design
  • Equipment procurement
  • Feasibility studies
  • Full system modeling
  • Grounding system design
  • Life-cycle modeling and analysis
  • Operator training
  • Power factor correction
  • Rate analysis
  • Relay coordination studies and design
  • Reliability evaluations
  • Short-circuit analysis
  • Substation design and construction
  • Uninterruptible power supply system design

Spotlight

Powerful Project: New Parkland Hospital to Rely on Central Utility Plant

Powerful Project: New Parkland Hospital to Rely on Central Utility Plant

As Parkland Hospital moves into a new, larger health care campus, it draws all essential thermal, electric, water and emergency utilities from a new central utility plant designed by Burns & McDonnell.

Read more

District Energy Feature: Dallas's Mega Health Care Project

District Energy Feature: Dallas's Mega Health Care Project

The new Parkland Hospital is served by state-of-the-art central plant, a $74 million facility providing essential thermal, electric, water and emergency utilities to the campus buildings. Resiliency, sustainability and long-term operational flexibility became the driving forces that shaped the design of the plant.

Read more