Youngdong Unit 2 FGD Retrofit

Location: Korea

Client: Korea Power Engineering Co. (KOPEC)

Burns & McDonnell recently provided KOPEC with design support services for the installation of a proprietary flue gas desulfurization (FGD) process to the Youngdong Power Station Unit 2. This coal-fired power station is owned by Korea Electric Power Corporation (KEPCO) and is rated approximately 200 MW. This project is the first full-scale FGD system installed in Korea.