North Camilla Substation Expansion

North Camilla Substation Expansion

Location: Georgia

Client: Municipal Electric Authority of Georgia

Completion Date: 2011

Burns & McDonnell was selected by the Municipal Electric Authority of Georgia (MEAG) as the engineer-procure-construct (EPC) contractor for its North Camilla Substation Expansion Project. The project consisted of adding a 230-46-kV, 62 MVA transformer, tie breaker and additional 46-kV line breakers to an existing site.

  • Transmission line construction
  • Substation construction
  • Transmission line and substation design
  • Procurement
  • 230-46-kV transformer and foundation
  • 230-kV, 1200A circuit switcher
  • 46-kV steel structures and accompanying foundations
  • Three 46-kV power circuit breakers and foundations
  • Two 46-kV station service transformers, including new AC distribution cabinet
  • Six 46-kV voltage transformers
  • Four new control and relaying panels
  • Substation grading and fence expansion
  • Installation of vehicle access gate and associated road
  • Installation of RTU cabinet
  • Control building expansion
  • 230-kV transmission line modifications
  • Testing and commissioning