Gas Plant FEP-3

Gas Plant FEP-3

Location: Southwest

Client: Confidential client

Burns & McDonnell was hired to provide stage three front-end project planning (FEP-3) services for a 150 million standard cubit feet per day (MM SCFD) gas plant addition in the Southwest. Burns & McDonnell completed the FEP-3 services, and then an engineer-procure-construct (EPC) contract was negotiated. Long lead equipment is being purchased and specified in order to shorten the project duration. Complex soil conditions, integration to existing operations and an aggressive schedule resulted in the owner choosing EPC execution. The owner also provided a significant portion of the major equipment procurement. Scope included upfront process evaluations to optimize the unit and operations. Early cost estimates facilitated scope control, module and shops fabrication, reduced cost, and improved schedule.

  • Front-end planning
  • Definitive estimate
  • Detailed design
  • Procurement
  • Construction
  • 150 MM SCFD Exterran gas plant system
  • 300 MM SCFD amine treating unit system
  • 400MM SCFD TEG unit (future)
  • Modular and stand-alone equipment
  • Post-compression design
  • Reciprocating compressors with Caterpillar engines
  • Predicted 88 percent to 91 percent ethane recovery without refrigeration
  • Integration into existing facility