Distribution System Services

Location: Washington

Client: Franklin County Public Utility District

Completion Date: 2006

Burns & McDonnell provided substation feeder getaway designs, and overhead and underground feeder rebuilds required for a new 115-kV to 12.5/7.2-kV substation for Franklin County Public Utility District. Recent and current projects include distribution line design including structure loading and cable pulling tension calculations, field surveying, field staking for construction crews, right-of-way research, easement descriptions, material list, one-line diagram and construction drawings and details.

  • Engineering Design
  • Permitting & Easements
  • Detailing & Mapping
  • Survey & Staking