Distribution System Rehabilitation

Distribution System Rehabilitation

Location: Columbus, Ohio

Client: The Ohio State University

This project features approximately 1,200 feet of walkable distribution tunnel, which will provide a much-needed revitalization to the original 1970s design; new high pressure steam and stainless steel condensate piping; structural repairs to the existing tunnel piping support structures; buried, high-density polyethylene natural gas piping; tunnel ventilation shafts; and improvements to the tunnel's lighting and power systems. These renovations, along with new piping supports and expansion joints, will increase the well-lit, maintainable space inside the tunnel for university staff and improve overall performance.