Delaware Mountain Collector Line

Location: Guadalupe Mountains National Park, Texas

Client: National Wind Power

Completion Date: 1999

This 9-mile 34.5-kV vertical collector line for 40 wind turbines) was built in hard-to-access terrain. The topography required the construction of many angle and dead-end structures. The challenging schedule required design, staking, material procurement and construction to be completed in approximately six months.

  • Engineering design
  • Procurement
  • Construction