Crude Oil Pipeline

Location: Oklahoma

Client: Confidential

Burns & McDonnell provided load studies, engineering and equipment procurement to increase flow rates on an existing crude oil pipeline. Three existing booster stations were modified including adding simultaneous pumps, new pump skids, DRA injection facilities, new pig traps, and providing controls and communication for remote operation.