Construction Permitting & Plant Application

Location: Maryville, Mo.

Client: Carbolytic Materials Co. LLC

Completion Date: 2009-2011

Carbolytic Materials Co. LLC has developed a proprietary carbon black alternative process that converts end-of-life rubber materials into reusable products. The first production facility is in Maryville, Mo.

Burns & McDonnell prepared both the air construction permit application and the tire processing plant application. This involved working closely and meeting with the Missouri Department of Natural Resources on several occasions. The permits were obtained in time for start of construction.

Additionally, Burns & McDonnell provided the following services:

  • Wetlands and floodplain desktop review
  • Storm Water Pollution Prevention Plan (SWPPP) for construction activities
  • Applicability determination request from EPA for carbon black plant
  • Preconstruction waiver
  • Storm Water Pollution Prevention Plan (SWPPP)
  • Spill Prevention, Control and Countermeasure (SPCC) planning
  • Construction permit
  • Regulatory applicability
  • Tire processing plant application
  • Wetlands and floodplain desktop review