Springdale, Ark. Projects

Archaeological Survey & Eligibility Evaluations
Location: Arkansas
Client: Dynegy Services Plum Point LLC
Description: 

Site detection surveys, historica archival research, geoarchaeological investigations and National Register of Historic Places evaluations within a 790-acre site proposed for a new Arkansas power generation project for Dynegy Services Plum Point LLC.

Arkansas Regional Training Institute
Location: Camp Robinson, Ark.
Client: Arkansas Army National Guard
Description: 

Architectural and engineering services for the Arkansas Regional Training Institute at Camp Robinson, including a 22,000-square-foot general instruction building.

Armed Forces Reserve Center
Location: Bentonville, Ark.
Client: National Guard Bureau, for the Arkansas Army National Guard
Description: 

Planning, design and construction support for an Armed Forces Reserve Center for the Arkansas Army National Guard and the U.S. Army Reserves in Bentonville, Ark.

Bentonville Armed Forces Reserve Center
Location: Bentonville, Ark.
Client: Arkansas Army National Guard
Description: 

Comprehensive A-E services for a new Armed Forces Reserve Center for the Arkansas Army National Guard in Bentonville, Ark.

Camden Armed Forces Reserve Center
Location: Camden, Ark.
Client: Arkansas Army National Guard
Description: 

Comprehensive Type A and B design services and Type C construction services for an Armed Forces Reserve Center for the Arkansas Army National Guard and the Army Reserves in Camden, Ark.

Chisolm Trail Parkway - Section 5
Location: Tarrant County, Texas
Client: North Texas Tollway Authority
Description: 

Corridor construction management for a limited-access toll road in southwest Tarrant County, connecting Fort Worth's central business district to southwest Fort Worth and south to Cleburne.

Flint Creek to Shipe Road Routing Review
Location: Benton County, Ark.
Client: American Electric Power (AEP)
Description: 

Transmission line routing review for two overhead transmission lines in Benton County, Ark., for American Electric Power (AEP).

Hydraulic & Hydrologic Evaluation
Location: Mountainburg, Ark.
Client: City of Fort Smith Utility Department
Description: 

Planning, design and construction phase services for the development of the enlarged Lake Fort Smith Water Supply Reservoir in Arkansas, including hydraulic modeling, water supply hydrology and physical hydraulic models.

Interchange Improvement Study
Location: Village of Bartlett, Ill.
Client: Illinois Department of Transportation
Description: 

Phase I preliminary engineering and environmental studies for the U.S. Route 20 and Illinois Route 59 interchange improvement study in the Village of Bartlett, Ill., for the Illinois Department of Transportation.

Lake Fort Smith Dam & Reservoir Enlargement
Location: Lake Fort Smith, Ark.
Client: City of Lake Fort Smith, Ark.
Description: 

Design of a single, enlarged dam and impoundment to replace the existing Lake Fort Smith and Lake Shepherd Springs reservoirs in Arkansas.

Lee Creek Water Treatment Plant
Location: Fort Smith, Ark.
Client: City of Fort Smith
Description: 

Services to provide for the long-range water supply and treatment needs of the city of Fort Smith, Ark.

Rail Spur Routing Study & Design
Location: Edwardsport, Ind.
Client: Duke Energy
Description: 

Rail spur routing study for Duke Energy to serve an integrated gasification combined cycle (IGCC) expansion project at its Edwardsport Generating Station northeast of Vincennes, Ind.

Razorback to Short Mountain
Location: Paris, Ark.
Client: Oklahoma Gas & Electric
Description: 

Routing, permitting, right-of-way acquisition and design for the Oklahoma Gas & Electric Razorback to Short Mountain project, 13-miles of new 161-kV transmission in Paris, Arkansas.

Regional Wastewater Conveyance System & Treatment Plant
Location: Washington and Benton counties, Ark.
Client: Northwest Arkansas Conservation Authority
Description: 

Engineering services for the planning and design of a new regional wastewater conveyance system and treatment plant for the Northwest Arkansas Conservation Authority (NACA) serving 10 cities in northwest Arkansas.

Route 19 Missouri River Bridge
Location: Hermann, Mo.
Client: Missouri Department of Transportation
Description: 

Design and construction plans for a new 2,244-foot bridge replacing an aging structure. New bridge includes a 44-foot roadway and 8-foot protected bikeway.

Valliant to Northwest Texarkana Transmission Line Routing
Location: Oklahoma, Arkansas and Texas
Client: American Electric Power
Description: 

Routing study for a 345-kV overhead transmission line with single-pole structures extending from McCurtain County, Okla., to Bowie County, Texas, for American Electric Power.

Wastewater Treatment Plant Digester Upgrade
Location: Springdale, Ark.
Client: Springdale Water Utilities
Description: 

Designed improvements to two 70-foot diameter and one 80-foot diameter anaerobic digesters at the City of Springdale, Arkansas’ Wastewater Treatment Plant.

Water and Sewer Rate Study and Engineer's Reports for Debt Issuance
Location: Fort Smith, Ark.
Client: Water and Sewer Utilities, City of Fort Smith, Ark.
Description: 

Comprehensive water and sewer rate study and analysis and report on debt issuance for the city of Fort Smith, Ark.