Milwaukee Projects

2012 Sustainability Report
Location: Chicago
Client: MillerCoors
Description: 

Content development for MillerCoors 2012 Sustainability Report.

ANR Pipeline Cofferdams
Location: Oshkosh, Wis.
Client: Michels Pipeline Construction
Description: 

Design and installation of two portable, temporary cofferdams for use in a Wisconsin lake to facilitate relocation of an existing natural gas pipeline.

Former Coke & Gas Site Remedial Investigation
Location: Southern Wisconsin
Client: Confidential
Description: 

Remedial investigation and feasibility study of a southern Wisconsin site that was used for coke and gas production from the late 1800s to the early 1980s.

Fuel Terminal Expansion
Location: Milwaukee
Client: Flint Hills Resources
Description: 

Design-build services for the expansion of the Milwaukee Fuel Terminal for Flint Hills Resources.

Route 83 Widening & Resurfacing
Location: Antioch, Ill.
Client: Illinois Department of Transportation
Description: 

Construction services for the widening and resurfacing of Route 83 from Petite Lake Road in Lake Villa, Ill., to the Wisconsin state line in Antioch, Ill.

Sustainability Consulting, Corporate Reporting and GHG Inventory
Location: Dallas
Client: Southwest Airlines
Description: 

Consulting on sustainability strategies, annual integrated reporting content development and a greenhouse gas inventory for Southwest Airlines.